What Are Hot Dip Galvanizing Lines, and Why Refractory Maintenance Is Critical
Most steel plant managers know what a hot dip galvanizing line does. Fewer know what holds it together. A hot dip galvanizing line, or HDGL,
Your source for all things Schad — announcements, employee honors, project highlights, and insights into our commitment to excellence, safety, and innovation in refractory services.

Most steel plant managers know what a hot dip galvanizing line does. Fewer know what holds it together. A hot dip galvanizing line, or HDGL,

Tight outage window? The lining method you choose can determine whether you make it back online on time. Furnace relines generally come down to two approaches: big-block precast, where

For most industrial facilities, the planned refractory outage are the highest-stakes maintenance events on the calendar. Done well, they extend equipment life, prevent unplanned failures, and keep operations running predictably for another year

Unplanned furnace downtime doesn’t announce itself. One shift it’s a hot spot on the shell. The next, the furnace is down, the crew is idle, and the phone calls

A rotary hearth furnace doesn’t give you a lot of warning before it becomes a problem. The operating conditions are demanding: continuous rotation, repeated thermal cycling, heavy product loads bearing down

Thermal oxidizers are not forgiving equipment. They run at high temperatures, process corrosive combustion gases, and operate under conditions that put sustained stress on every component inside the unit. The

In industrial refractory work, safety isn’t a policy document. It’s the difference between a smooth outage and a serious incident. Before Schad crews set foot

Choosing the right refractory material is rarely straightforward. The wrong choice can mean premature failure, unnecessary downtime, or a rebuild that could have been avoided.

A new refractory lining is not ready to run at full temperature the moment the last brick is set or pound is cast. What happens

Refractory linings don’t fail overnight. Degradation is gradual, and so is the decision about what to do about it. For plant engineers and procurement managers,

Eight weeks. Up to 40 tradesmen on-site per day. Multiple trades, one furnace, one window to get it right. The glass furnace reline Schad completed
Schad is proud to recognize Joel Stewart as our Employee of the Month for his strong focus on safety, attention to detail, and consistency. Beyond