Caste Study: Waste-To-Energy in Oregon
In late 2019 and early 2020, Schad teamed up with a waste recycling/engineering company to build a high-tech waste-to-energy system designed to input hazardous and
Your source for all things Schad — announcements, employee honors, project highlights, and insights into our commitment to excellence, safety, and innovation in refractory services.

In late 2019 and early 2020, Schad teamed up with a waste recycling/engineering company to build a high-tech waste-to-energy system designed to input hazardous and

In September 2019, Schad completed a project for a Great Lakes Region steel producer. The project called for the complete reline of a combustion chamber

In October, Schad took on a challenging project at an Eastern Ohio steel mill. The project involved working on four different furnaces during a two-week

Every so often, we get introduced to a project where we have to rethink our approach. Schad recently just finished one of those projects for

In November, Schad performed maintenance work on a round-top melting furnace at a Western Kentucky aluminum plant. The scope included removal and replacement of the ramp, sill,

Schad completed a large project on a pusher style reheat furnace at a Great Lakes Region steel mill. The project included a full hearth replacement,

In January 2019, Schad completed two large aluminum reverb furnace relines for a single customer at two facilities, one in the Northern Great Lakes and

In mid-October Schad began work on a re-heat furnace re-build project at a Northeastern Ohio steel mill. The project included replacement of refractory materials throughout

In late October 2018, Schad completed the total reline of a 60-ton channel induction furnace at a Tennessee iron foundry. Planning the reline Our scope
In December 2016, Schad Refractory was hired by a chemical disposal company in Chicago for a refractory installation. The technology used by the company disposes
Learn how Schad completed refractory repairs at a hazardous waste facility safely, on time, and on budget. In September 2016, Schad Refractory completed a turnaround
Learn how Schad completed a reline on a 100,000 pound aluminum re-melting furnace. In August 2016, Schad performed a complete reline on a 100,000 lb.